Urban Toronto - Powered by vBulletin

Search:

Type: Posts; User: officedweller

Page 1 of 20 1 2 3 4

Search: Search took 0.15 seconds.

  1. But Sears' offices are remaining on site during...

    But Sears' offices are remaining on site during Toronto construction, aren't they?

    That alone suggests a less invasive renovation than the gut-job in Vancouver.
  2. Replies
    124
    Views
    26,561

    From Evergreen Facebook - Coquitlam Central...

    From Evergreen Facebook -

    Coquitlam Central Station:

    https://scontent-a-sea.xx.fbcdn.net/hphotos-xpa1/t1.0-9/10511094_834374859942353_7313487251694208_n.jpg


    North Road:
    ...
  3. From SSP:

    From SSP:
  4. Pics by me today: Starting to show past...

    Pics by me today:

    Starting to show past FortisBC Tower.
    Note the twist vis-a-vis FortisBC's straight edge.

    http://i.imgur.com/q4NT8nY.jpg

    http://i.imgur.com/519KWlU.jpg

    ***************
  5. There's also an express elevator to the 6th floor...

    There's also an express elevator to the 6th floor men's floor in Vancouver -
    It only stops at the SkyTrain Concourse Level (subbasement), Mall Level (basement), Main (street) and 6th Floor (but you...
  6. The Telus Garden office tower in Vancouver will...

    The Telus Garden office tower in Vancouver will have raised floors
    - but it looks like a consequence will be ugly ceilings.
    Note that the sprinkler heads are above the pipes, meaning no drop...
  7. Replies
    124
    Views
    26,561

    More pics by Yellow Fever at SSC:

    More pics by Yellow Fever at SSC:
  8. Replies
    124
    Views
    26,561

    From Yellow Fever at SSC: Guideway at Lougheed...

    From Yellow Fever at SSC:

    Guideway at Lougheed Town Centre / North Road:
  9. From SSP:

    From SSP:
  10. Replies
    4,086
    Views
    303,518

    With ATC, could they implement a rush hour short...

    With ATC, could they implement a rush hour short turn route with trains reversing north of Bloor on the Yonge Line and north of Spadina on the Spadina line?

    If the time to crossover is too long,...
  11. Replies
    124
    Views
    26,561

    Video at Lougheed Station from SSP:

    Video at Lougheed Station from SSP:
  12. From SSP:

    From SSP:
  13. Great shot. I like how the square windows at...

    Great shot.

    I like how the square windows at the top of the Victory Building transition from the 390 Bay building behind to the back of the building on the left.
  14. I thought the same thing! With the blind...

    I thought the same thing!
    With the blind corners, it's bound to happen.
  15. Replies
    124
    Views
    26,561

    A gantry footing slipped off its support:

    A gantry footing slipped off its support:
  16. From the TriCities Now: ...

    From the TriCities Now:



    http://www.thenownews.com/news/dismantling-of-old-port-mann-a-challenge-1.1132072
  17. First pieces removed from the old arch span: ...

    First pieces removed from the old arch span:

    http://i.imgur.com/wjawqtR.png...
  18. The standard configuration at SkyTrain stations...

    The standard configuration at SkyTrain stations in Vancouver (even new ones like Canada Line) is
    - elevator for handicapped access, up escalator and stairs (for both up and down).
    There may be...
  19. 5 levels of underground parking? Are they...

    5 levels of underground parking?

    Are they planning on a future office tower on that site too?
  20. Replies
    124
    Views
    26,561

    From SSP today:

    From SSP today:
  21. Would have looked better if they had angled them...

    Would have looked better if they had angled them relative to each other
    and centred it over the top of the building - even hanging over the top edge.
  22. Replies
    124
    Views
    26,561

    Investigation Report for that shifting guideway...

    Investigation Report for that shifting guideway segment at Como Lake Road posted here.
    It says the section was always intended to be part of a continuous span section, so there were no risers on top...
  23. From SSP June 11, 2014:

    From SSP June 11, 2014:
  24. Replies
    124
    Views
    26,561

    Pics of Coquitlam Central Station from SSP. The...

    Pics of Coquitlam Central Station from SSP.
    The additional rebar columns to the right in the first pics are for a switch and spur
    for a future extension to Port Coquitlam, Maple Ridge and Pitt...
  25. Somewhat relevant - for the at-grade sections of...

    Somewhat relevant - for the at-grade sections of the Evergreen Line in Metro Vancouver, they are using "soil-mixing" (mixing soil and concrete) to stabilize soft soils without the need to drive piles...
Results 1 to 25 of 500
Page 1 of 20 1 2 3 4