Urban Toronto - Powered by vBulletin

Search:

Type: Posts; User: drum118

Page 1 of 20 1 2 3 4

Search: Search took 0.18 seconds.

  1. Replies
    534
    Views
    114,811

    It could because of the mall extension south of...

    It could because of the mall extension south of it where a new walkway will be that includes the current Moxie along with Holts addition. There is also another retail at the east entrance in the...
  2. Replies
    383
    Views
    102,032

    Most likely going where Quiznos used to be. There...

    Most likely going where Quiznos used to be. There is another place beside it up for lease also for the past year.

    Britic Markt? open last month and is very busy every time I gone by it. They have...
  3. Replies
    110
    Views
    26,184

    So much for mid July opening and looks like I...

    So much for mid July opening and looks like I haven't miss much in the last month or so not visiting it. It was supposed to be the end of May, then in June, first weekend in July and then this...
  4. The only reason why a 2nd bid show up was the...

    The only reason why a 2nd bid show up was the supplier trying to keep their foot in the doorway hoping the bidding process would change from sole supplier to any buyer. The rest refused to bid...
  5. The engineers have stated that the current cars...

    The engineers have stated that the current cars would have to be redesign to add extra sections. Talking to the other competitors as far back as 2005, they stated no engineering would be required to...
  6. What with the National Post, as they have posted...

    What with the National Post, as they have posted the most write ups in day than the blue moon ones? This writer as well others are off based more ways than enough and haven't done their homework. I...
  7. Replies
    222
    Views
    37,028

    I am talking about the new tunnel from the new...

    I am talking about the new tunnel from the new bus terminal to the GO platform at the west end.

    How do you expect to get around the condo as there is "NO" land south of it that it can use for the...
  8. Replies
    222
    Views
    37,028

    Issue 1: You have about 250 m to the GO Tunnel...

    Issue 1: You have about 250 m to the GO Tunnel and you need to be down 15-20 m min by then from the current west end of the station, not the trail track.

    Issue 2: You need to be down 35-50 m by...
  9. Yes our cars will be full built when they arrive...

    Yes our cars will be full built when they arrive here starting next month if things are still on schedule.

    There are equipment bought in the US that don't comply with the Buy America since they...
  10. Replies
    222
    Views
    37,028

    How do you plan on getting the subway from...

    How do you plan on getting the subway from Sherway to Dixie with the rail corridor off the table and miss servicing 100,000+ need residents/employees between those 2 stations??
  11. Also to meet the Buy America requirements for the...

    Also to meet the Buy America requirements for the ones for California.
  12. Replies
    222
    Views
    37,028

    As I stated in the past and was stated by the...

    As I stated in the past and was stated by the team at the meeting, the subway extension west of Kipling using the rail corridor is dead as there is no room in it to support the 4 tracks for the...
  13. Replies
    222
    Views
    37,028

    Yes, but part of the 2016 review. This has no...

    Yes, but part of the 2016 review. This has no effect on this plan even it ends up being only temporary. About 100 out for the meeting consider there been next to no notification of this meeting in...
  14. Replies
    222
    Views
    37,028

    Based on tonight presentation for the new Kipling...

    Based on tonight presentation for the new Kipling Regional Terminal, 2019 is still the shooting date to have it open, but maybe 2020.

    This is a ram thought project with little input from the...
  15. Its my understanding that the new platform at...

    Its my understanding that the new platform at Weston is to go into service by September to allow the current platform to be rebuilt like the one being built. The last platform will be done in 2015.
    ...
  16. I was point out where it starts and you will find...

    I was point out where it starts and you will find it happening on other systems where you can bypass the paying area. What good is it trying to collect money from a homeless person in the first place...
  17. By the time the Presto is roll out, most of TTC...

    By the time the Presto is roll out, most of TTC fare media will become history including the tokens.

    Tokens will be one of the first to go due to their storage and collection weight. You just buy...
  18. Can't recall not seeing fare machines on the...

    Can't recall not seeing fare machines on the street of the systems I saw in 2012 other than Amsterdam for trams.

    Having machines on the trams only is only going to lead to issues where people...
  19. It has to happen from time to time as you can't...

    It has to happen from time to time as you can't stop a pour because it night.

    Most of the pours will be done by September and will not take place during the night.

    The residents are warn when...
  20. Not sure if this will link, but a laugh from the...

    Not sure if this will link, but a laugh from the dash. Some of the tram drivers had no clue how to drive from the looks of it. From Russia with laugh

    http://www.youtube.com/josedejesus995

    Try...
  21. Talks have broken down in Thunder Bay and 2 pm...

    Talks have broken down in Thunder Bay and 2 pm Monday is strike time.

    Goes to their metro.

    Could never get an interior shot. Did this 1 day unplanned trip, as it was gong rain in Wien and nice...
  22. Seen them, been on them and they are packed all...

    Seen them, been on them and they are packed all the time.

    They have order 61m cars now.

    45m is becoming the standard for cars now.
  23. The Hurontario is stopping in Port Credit, but...

    The Hurontario is stopping in Port Credit, but not in the centre of it. It stopping at the GO station for now.
  24. That was to be done under Transit City plan....

    That was to be done under Transit City plan. There was talk that St Clair would be cut off from the rest of TTC system when it came to replace the tracks in 20 years so they would be standard gauge...
  25. Track gauge in a non issues as a starter since...

    Track gauge in a non issues as a starter since they can be change to meet what every gauge it must run on.

    TTC bought standard gauge PCC from systems selling their and change the wheel gauge to...
Results 1 to 25 of 500
Page 1 of 20 1 2 3 4