Recent content by The Insider

  1. T

    Toronto QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    Brick Restoration shoud start soon, ie more scaffolding, as well windows should be going in, think they will try and get this building watertight
  2. T

    Toronto Globe and Mail Headquarters: Never-Built | ?m | 18s | The Globe and Mail | KPMB

    Depending on the progress of the Rigs and the stage Deep Foundations is at, it could be cheaper to just let them complete their contract instead of terminating it. Redesign will drastically change structure, construction will stop very unfortunate
  3. T

    Toronto Union Centre | 298m | 54s | Westbank | Bjarke Ingels Group

    Good Catch, you will notice that this Metrolinx is within the Skywalk, You can see the 50 storey office tower above the skywalk at station and simcoe, there is a scheme where the skywalk existing glazing is torn down and redone
  4. T

    Residence for the Sisters of St. Joseph (2 O'Connor Dr, 4s, Shim-Sutcliffe) COMPLETE

    Project looks best is early morning or early evening light, especially the Chapel. Wood Fin Mockup is in the Chapel, 8 m tall !!!! Copper is going in along Top and Bottom of Curtainwall, when finished, the South Perimeter will have a Corten Eyebrow Installed Tile work has started at North...
  5. T

    Toronto QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    Bracing for the Masonry walls, so they dont collapse, as the interior slabs will be demo'd and rebuilt inclusive of those Steel X Frames.
  6. T

    Kipling Acres Potential Redevelopment

    The Tender Call for this Project closed Today. Buttcon Low at 43.5 mil (+/-) 2nd was Percon at 49.25 (+/-) ouch, hope somebody didnt forget a zero
  7. T

    Toronto QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    http://www.castconnex.com/Nav/projects1.html Scroll Down to see some Images of the Steel Nodes from the Fabricators Website.
  8. T

    Toronto QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    1st stage is the bracing of 4 sided walls with interior demo of existing slabs, then reno of interior building.
  9. T

    Toronto QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    I have been to this ING Building twice with a friend while she was running an errand, All i have to say is its a Bitch to get yourself onto that street, very confusing
  10. T

    Toronto QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    Im not sure if they have indeed signed the main tenant, I was hearing ING was pitched, shall inquire. Subtrade Tenders for Shoring & Underpinning, Excavation, Formwork, Reinforcing are out on the street.
  11. T

    Toronto QRC West (Queen Richmond Centre West) | 71.93m | 17s | Allied | Sweeny &Co

    This Project will get going very soon. Demolition will start soon, the Existing Facades will be retained and braced while the interior slabs will be demo'd down. The Massive X jacks is being detailed by Walters of Hamilton and the Structural Glass that surrounds the 5 storey atrium is being...
  12. T

    Toronto Emerald City Phases 1 to 3 including Dream Tower | ?m | 36s | Almadev | WZMH

    There is a Great many number of Caissions that need to be drilled.
  13. T

    Elementary Teachers Federation of ON (15 Huntley St., 4s, KPMB)

    RBG is the Ron Boyko Group, demo sub
  14. T

    Toronto June Callwood Park | ?m | ?s | City of Toronto | gh3

    Prequalification for Landscape Contractors, Go Aldershot!!! https://wx.toronto.ca/inter/pmmd/calls.nsf/0/B528EE72E3859ED185257893005AB709?OpenDocument Tender - Prequalification Call number: 3717-11-5032 Commodity: Construction Services, Landscape Construction Description: June...