Toronto Maple Leaf Square | 185.92m | 54s | Lanterra | KPMB

Taken June 1:
2566526036_40c2895e89_m.jpg

View larger
 
June 17

Looking north. They are starting to work on the west side of the ACC. The area is closed to the public because of construction. Telus is on the left.
2587683253_53e6fe3819_b.jpg


Looking southeast.
2587683263_9352b5f234_b.jpg


The temporary ramp is being demolished.
2587683281_42869c6a8f_b.jpg


The new south ramp to Lake Shore is now open. Looking east.
2587683299_667de20574_b.jpg
 
The ramps explained:

I clarified it over on SCC so ill do the same here...

The temporary ramp is an exit ramp for the ACC. It will be relocated to the south end of the site running parallel to Lakeshore. The entrance to the ACC is off Bay St.

The entrance for MLS is shown in the above blueprint off Bremner and curving West.

and follow the link in the quote to see the MLS groundfloor blueprints.
 
I'm not quite sure why everyone is so concerned with ramps. I thought we were interested in skyscrapers, not ramps! :p
 