11K   1   210 
St Michael's Hospital Patient Care Tower
share  tweet  share 
  14 renderings
Nov 29, 2011 - St Michael’s Hospital will build five new state-of-the-art operating rooms and relocate patient beds from an 85-year-old wing as part of a 17-storey patient care tower approved by the provincial government today.

The project will also allow the hospital to nearly double the size of its emergency department, which now sees close to 70,000 patients a year, about 1.5 times the number it was designed to handle.

The tower, to be built at the northeast corner of Queen and Victoria Streets in downtown Toronto, will also provide larger space for programs that treat some of the most critically ill patients from across Ontario, including the medical-surgical intensive care unit and the largest adult cystic fibrosis clinic in North America.

“This new tower will transform patient care at St Michael’s,” said hospital President and CEO Dr. Robert Howard. “It will enable us to move patients out of hospital wings built as long as 85 years ago into modern, spacious units that have been specially designed to meet modern infection control standards and maximize the amount of time nurses and other health-care workers spend with patients.”

Improvements to patient flow will reduce wait times for a variety of services, including cardiac care, cancer care and surgeries, he said.

Dr. Howard said that without the new tower, St Michael’s was in danger of no longer being able to take advantage of new technologies necessary to provide quality patient care.

Highlights of the new 250,000 sq ft. tower include:

Five new operating rooms, each big enough to include imaging equipment such as CT scans, which are an essential element of modern surgery. These “hybrid operating rooms” will allow surgeons to perform minimally invasive, image-guided or catheter-based procedures as well as undertake open surgery in the same OR. Not having to transfer patients to separate imaging rooms increases patient safety and decreases operation times.

Enlarged, state-of-the art facilities for orthopedic surgery, coronary care and respirology, including the cystic fibrosis program.

An expanded emergency department. The current department was rebuilt in 1983 to accommodate 45,000 patients, but now sees 70,000 a year. That number is expected to grow as more people move into downtown Toronto. The expansion will allow St Michael’s to continue to fulfill its mandate as a regional trauma centre

St Michael’s Hospital was built in 1892. While the hospital recently opened its new research and education centre, the Li Ka Shing Knowledge Institute, the last major construction of new patient care areas was completed in 1996-- the first nine floors of the Cardinal Carter South Wing.

The new tower will not require any new operations money for patient care and there will be no increase in staff, beds or programs.

“We will be doing the same amount of work, only better,” Dr. Howard said.

Construction could begin within two years and be completed three years after that.

Find out how to promote this project on UrbanToronto
Expand/Collapse All   |   Export CSV
Project Information
Full data set available with a UTPro subscription
Earliest Application Date 0000-00-00 Construction Status Complete
Category Institutional (Health Care) Construction Began 0000-00-00
    Completion Date 0000-00-00
Address 131 Victoria St, Toronto, Ontario, M5B 1W8 Other Addresses XXX XXXXXX XX, XXX XXXXXX XX
Latitude XXXXXXXXX Longitude XXXXXXXXX
Region XXXXXX Ward XX
MLS Zone XX    
Field Updates
XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX'.

XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX

XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX
Project Attributes
Full data set available with a UTPro subscription
FAR/FSI XXXXXX Crane Number XX
Site Area XXXXXX XX Heritage XXX
Number of Buildings 1    
Maximum Height 0 ft / 0 m    
Maximum Storeys 17    
Underground Levels X    
Project Companies
Developer St. Michael's Hospital
Builder Bondfield Construction
Architect NORR Architects & Engineers Limited, Diamond Schmitt Architects
Engineering WSP
Roofing LiveRoof Ontario Inc
Signage/Wayfinding entro
Other entro, Priestly Demolition Inc.
Units
Full data set available with a UTPro subscription
Total Number Of Units Total Rental Units XXX
Building Units Hotel Units XXX
Market-Rate Rental Units XXX Freehold Units XXX
Condo Units XXX Other Units XXX
Unspecified Tenure Units XXX Affordable Rental Units XXX
    Rental Replacement Units XXX
Unit Mix
Full data set available with a UTPro subscription
Studios XXX    
1 Bedrooms XXX    
2 Bedrooms XXX    
3+ Bedrooms XXX    
Gross Floor Area
Full data set available with a UTPro subscription
Total GFA XXXXXX XX Office GFA XXXXXX XX
Commercial GFA XXXXXX XX Residential GFA XXXXXX XX
Industrial GFA XXXXXX XX Retail GFA XXXXXX XX
Institutional GFA XXXXXX XX    
Parking
Full data set available with a UTPro subscription
Total Vehicular Parking XXX Office Parking XXX
Residential Parking XXX Industrial Parking XXX
Visitor Parking XXX Institutional/Other Parking XXX
Retail Parking XXX    
    Bike Parking XXX
Access and Services
Full data set available with a UTPro subscription
Road Access XXXXXX XXXXXX Mass Timber XXX
Municipal Water XXXXXX XXXXXX Green Standards XXXXXX
Municipal Sanitary Sewers XXXXXX XXXXXX LEED Certified XXXXXX
Municipal Storm Sewers XXXXXX XXXXXX Passive Home Certified XXX
Other (Septic) XXXXXX XXXXXX    
Minimum Setbacks
Full data set available with a UTPro subscription
Front Lot Line Direction X Side Lot Line 1 Direction X
Front Lot Line Existing XXXXXX Side Lot Line 1 Existing XXXXXX
Front Lot Line Proposed XXXXXX Side Lot Line 1 Proposed XXXXXX
       
Rear Lot Line Direction X Side Lot Line 2 Direction X
Rear Lot Line Existing XXXXXX Side Lot Line 2 Existing XXXXXX
Rear Lot Line Proposed XXXXXX Side Lot Line 2 Proposed XXXXXX
Applications
Full data set available with a UTPro subscription
Primary Approval XXX
Submission Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
DevApp URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Application Types XXXXXX XXXXXX XXXXXXXXXXXX
XXXXXX XXXXXX XXXXXXXXXXXX
OLT URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Approval Status XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Council Decision URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Approval Sub-Status XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Application #s XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Council Decision Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
OLT #s XXX: XXXXXX
XXX: XXXXXX
XXX: XXXXXX
Appeal Received Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
MZO #s XXX: XXXXXX
XXX: XXXXXX
XXX: XXXXXX
OLT Decision Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
   
MZO Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
   
Permits
Full data set available with a UTPro subscription
Links
Full data set available with a UTPro subscription
Website XXXXXXXXXXXXXXXXXX Registration XXXXXXXXXXXXXXXXXX
Email Social Media XXXXXXXXXXXXXXXXXX
Other XXXXXXXXXXXXXXXXXX    
Documents
Full data set available with a UTPro subscription
XXXXXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXX XXXXXXXXX-XX-XX
XXXXXXXXXX XXXXXXXXXXXXX-XX-XX
XXXXXXXXXXX XXXXXXXXXX-XX-XX
XXXXXX XXXXXXXXXXX-XX-XX
XXXXXXXX XXXXXXXXXXXXXX-XX-XX
XXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXXX XXXXXXXXXX-XX-XX
XXXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXXX XXXXXXXXXXXXXXX-XX-XX
Something is not right? Let us know!
Forum
Buildings Discussion
Views: 171K  |  Replies: 428  |  Last Post: Oct 08, 2025

Member Photos  
  210 photos

News