
St Michael's Hospital Patient Care Tower
14 renderings
Nov 29, 2011 - St Michael’s Hospital will build five new state-of-the-art operating rooms and relocate patient beds from an 85-year-old wing as part of a 17-storey patient care tower approved by the provincial government today.
The project will also allow the hospital to nearly double the size of its emergency department, which now sees close to 70,000 patients a year, about 1.5 times the number it was designed to handle.
The tower, to be built at the northeast corner of Queen and Victoria Streets in downtown Toronto, will also provide larger space for programs that treat some of the most critically ill patients from across Ontario, including the medical-surgical intensive care unit and the largest adult cystic fibrosis clinic in North America.
“This new tower will transform patient care at St Michael’s,” said hospital President and CEO Dr. Robert Howard. “It will enable us to move patients out of hospital wings built as long as 85 years ago into modern, spacious units that have been specially designed to meet modern infection control standards and maximize the amount of time nurses and other health-care workers spend with patients.”
Improvements to patient flow will reduce wait times for a variety of services, including cardiac care, cancer care and surgeries, he said.
Dr. Howard said that without the new tower, St Michael’s was in danger of no longer being able to take advantage of new technologies necessary to provide quality patient care.
Highlights of the new 250,000 sq ft. tower include:
Five new operating rooms, each big enough to include imaging equipment such as CT scans, which are an essential element of modern surgery. These “hybrid operating rooms” will allow surgeons to perform minimally invasive, image-guided or catheter-based procedures as well as undertake open surgery in the same OR. Not having to transfer patients to separate imaging rooms increases patient safety and decreases operation times.
Enlarged, state-of-the art facilities for orthopedic surgery, coronary care and respirology, including the cystic fibrosis program.
An expanded emergency department. The current department was rebuilt in 1983 to accommodate 45,000 patients, but now sees 70,000 a year. That number is expected to grow as more people move into downtown Toronto. The expansion will allow St Michael’s to continue to fulfill its mandate as a regional trauma centre
St Michael’s Hospital was built in 1892. While the hospital recently opened its new research and education centre, the Li Ka Shing Knowledge Institute, the last major construction of new patient care areas was completed in 1996-- the first nine floors of the Cardinal Carter South Wing.
The new tower will not require any new operations money for patient care and there will be no increase in staff, beds or programs.
“We will be doing the same amount of work, only better,” Dr. Howard said.
Construction could begin within two years and be completed three years after that.
Find out how to promote this project on UrbanToronto
Expand/Collapse All
|
Export CSV
Full data set available with a UTPro subscription
|
|
Earliest Application Date
0000-00-00
|
Construction Status
Complete
|
|
Category
Institutional (Health Care)
|
Construction Began
0000-00-00
|
|
|
Completion Date
0000-00-00
|
|
Address
131 Victoria St, Toronto, Ontario, M5B 1W8
|
Other Addresses
XXX XXXXXX XX, XXX XXXXXX XX
|
|
Latitude
XXXXXXXXX
|
Longitude
XXXXXXXXX
|
|
Region
XXXXXX
|
Ward
XX
|
|
MLS Zone
XX
|
|
Field Updates
XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX'.
XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX
XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX
|
Full data set available with a UTPro subscription
|
|
FAR/FSI
XXXXXX
|
Crane Number
XX
|
|
Site Area
XXXXXX XX
|
Heritage
XXX
|
|
Number of Buildings
1
|
|
|
Maximum Height
0 ft / 0 m
|
|
|
Maximum Storeys
17
|
|
|
Underground Levels
X
|
|
Full data set available with a UTPro subscription
|
|
Total Number Of Units
|
Total Rental Units
XXX
|
|
Building Units
|
Hotel Units
XXX
|
|
Market-Rate Rental Units
XXX
|
Freehold Units
XXX
|
|
Condo Units
XXX
|
Other Units
XXX
|
|
Unspecified Tenure Units
XXX
|
Affordable Rental Units
XXX
|
|
|
Rental Replacement Units
XXX
|
Full data set available with a UTPro subscription
|
|
Studios
XXX
|
|
|
1 Bedrooms
XXX
|
|
|
2 Bedrooms
XXX
|
|
|
3+ Bedrooms
XXX
|
|
Full data set available with a UTPro subscription
|
|
Total GFA
XXXXXX XX
|
Office GFA
XXXXXX XX
|
|
Commercial GFA
XXXXXX XX
|
Residential GFA
XXXXXX XX
|
|
Industrial GFA
XXXXXX XX
|
Retail GFA
XXXXXX XX
|
|
Institutional GFA
XXXXXX XX
|
|
Full data set available with a UTPro subscription
|
|
Total Vehicular Parking
XXX
|
Office Parking
XXX
|
|
Residential Parking
XXX
|
Industrial Parking
XXX
|
|
Visitor Parking
XXX
|
Institutional/Other Parking
XXX
|
|
Retail Parking
XXX
|
|
|
|
Bike Parking
XXX
|
Full data set available with a UTPro subscription
|
|
Road Access
XXXXXX XXXXXX
|
Mass Timber
XXX
|
|
Municipal Water
XXXXXX XXXXXX
|
Green Standards
XXXXXX
|
|
Municipal Sanitary Sewers
XXXXXX XXXXXX
|
LEED Certified
XXXXXX
|
|
Municipal Storm Sewers
XXXXXX XXXXXX
|
Passive Home Certified
XXX
|
|
Other (Septic)
XXXXXX XXXXXX
|
|
Full data set available with a UTPro subscription
|
|
Front Lot Line Direction
X
|
Side Lot Line 1 Direction
X
|
|
Front Lot Line Existing
XXXXXX
|
Side Lot Line 1 Existing
XXXXXX
|
|
Front Lot Line Proposed
XXXXXX
|
Side Lot Line 1 Proposed
XXXXXX
|
|
|
|
|
Rear Lot Line Direction
X
|
Side Lot Line 2 Direction
X
|
|
Rear Lot Line Existing
XXXXXX
|
Side Lot Line 2 Existing
XXXXXX
|
|
Rear Lot Line Proposed
XXXXXX
|
Side Lot Line 2 Proposed
XXXXXX
|
Full data set available with a UTPro subscription
|
|
Primary Approval
XXX
|
Submission Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
DevApp URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX
|
Application Types
XXXXXX XXXXXX XXXXXXXXXXXX XXXXXX XXXXXX XXXXXXXXXXXX
|
OLT URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX
|
Approval Status
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX
|
Council Decision URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX
|
Approval Sub-Status
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX
|
Application #s
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX
|
Council Decision Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
OLT #s
XXX: XXXXXX XXX: XXXXXX XXX: XXXXXX
|
Appeal Received Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
MZO #s
XXX: XXXXXX XXX: XXXXXX XXX: XXXXXX
|
OLT Decision Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
|
MZO Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
|
Full data set available with a UTPro subscription
|
Full data set available with a UTPro subscription
|
|
Website
XXXXXXXXXXXXXXXXXX
|
Registration
XXXXXXXXXXXXXXXXXX
|
|
Email
|
Social Media
XXXXXXXXXXXXXXXXXX
|
|
Other
XXXXXXXXXXXXXXXXXX
|
|
Full data set available with a UTPro subscription
|
XXXXXXXX XXXXXXXXXXXX-XX-XX |
XXXXXXXX XXXXXXXXX-XX-XX |
XXXXXXXXXX XXXXXXXXXXXXX-XX-XX |
XXXXXXXXXXX XXXXXXXXXX-XX-XX |
XXXXXX XXXXXXXXXXX-XX-XX |
XXXXXXXX XXXXXXXXXXXXXX-XX-XX |
XXXXX XXXXXXXXXXXX-XX-XX |
XXXXXXXXX XXXXXXXXXX-XX-XX |
XXXXXX XXXXXXXXXXXX-XX-XX |
XXXXXXXXX XXXXXXXXXXXXXXX-XX-XX |
|
|
|
|
Views: 171K | Replies: 428 | Last Post: Oct 08, 2025
|
 | 210 photos |