Corktown Common
share  tweet  share 
  4 renderings
Corktown Common in the West Don Lands Toronto by Michael Van Valkenburgh & Waterfront Toronto

The centrepiece of the West Don Lands, Corktown Common will be a 7.3 hectare (18 acre) active, vibrant and inviting park that will not only serve the local community, but residents from throughout Toronto and visitors from far and wide. Construction of the park, which will occupy the south eastern portion of the neighbourhood and will run along the Don River from King Street to the rail corridor in the south, started in September 2010. When completed, the beautiful green space will invite people to the Don River and offer inspiring experiences along the river’s edge as well as spectacular views of downtown and Lake Ontario.

Corktown Common will transform an abandoned post-industrial site into a dynamic, year-round, re-naturalized public park, animated by a wide variety of programming and a beautiful multi-functional Pavilion. Innovatively positioned atop the area’s Flood Protection Landform (FPL), the park will renew the site while addressing vital infrastructure, taking full advantage of the robust topography.

The park design by Michael Van Valkenburgh Associates was integrated into the contours and the elevation provided by the FPL. The design capitalizes on the unique landscape to open sightlines to the Toronto skyline and the lake, creating a sense of scale and grandeur.

two distinct halves

At the broadest scale, the FPL organizes the park both physically and programmatically into two distinct halves. In response to site conditions and FPL regulations that restrict active recreation and the planting of woody vegetation on the eastern slope of the landform, an extensive 3.2 hectare (7.9 acre) urban prairie will be created on the river side of the park. The urban prairie grassland will include an upland meadow on the upper slope, while a lowland wet meadow at the base of the landform will add ecological and experiential diversity. The wet meadow will be a crucial part of a park-wide ecological stormwater recycling system. Meandering trails, multi-use bike paths, and a boardwalk will allow visitors to explore this unique urban landscape. Along the Don River, renewal of the multi-use trail system and new access under the Bala railway corridor will provide direct access to the Don River Trail and the river’s edge.

The 3.6 hectare (8.9 acre) western city side of the FPL is defined by a dynamic, unfolding topography that creates varied, flexible spaces for a diverse range of passive and active pursuits. Woodland plantings will work in concert with the topography to define each space and screen views of the surrounding urban infrastructure. The spaces in this part of the park will be more introspective, allowing immersive experiences of nature providing opportunities for focused specific activities, ranging from soccer and lacrosse to bird watching, picnicking, concerts, and tobogganing.

Find out how to promote this project on UrbanToronto
Expand/Collapse All   |   Export CSV
Project Information
Full data set available with a UTPro subscription
Earliest Application Date 0000-00-00 Construction Status Complete
Category Public Space / Park Construction Began 0000-00-00
    Completion Date 0000-00-00
Address 155 Bayview Ave, Toronto, Ontario, M5A 0G4 Other Addresses XXX XXXXXX XX, XXX XXXXXX XX
Latitude XXXXXXXXX Longitude XXXXXXXXX
Region XXXXXX Ward XX
MLS Zone XX    
Field Updates
XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX'.

XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX

XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX
Project Attributes
Full data set available with a UTPro subscription
FAR/FSI XXXXXX Crane Number XX
Site Area XXXXXX XX Heritage XXX
Number of Buildings    
Maximum Height 0 ft / 0 m    
Maximum Storeys 0    
Underground Levels X    
Project Companies
Developer Waterfront Toronto
Architect Maryann Thompson Architects
Landscape Architect Michael Van Valkenburgh Associates
Other urbanMetrics inc.
Units
Full data set available with a UTPro subscription
Total Number Of Units Total Rental Units XXX
Building Units Hotel Units XXX
Market-Rate Rental Units XXX Freehold Units XXX
Condo Units XXX Other Units XXX
Unspecified Tenure Units XXX Affordable Rental Units XXX
    Rental Replacement Units XXX
Unit Mix
Full data set available with a UTPro subscription
Studios XXX    
1 Bedrooms XXX    
2 Bedrooms XXX    
3+ Bedrooms XXX    
Gross Floor Area
Full data set available with a UTPro subscription
Total GFA XXXXXX XX Office GFA XXXXXX XX
Commercial GFA XXXXXX XX Residential GFA XXXXXX XX
Industrial GFA XXXXXX XX Retail GFA XXXXXX XX
Institutional GFA XXXXXX XX    
Parking
Full data set available with a UTPro subscription
Total Vehicular Parking XXX Office Parking XXX
Residential Parking XXX Industrial Parking XXX
Visitor Parking XXX Institutional/Other Parking XXX
Retail Parking XXX    
    Bike Parking XXX
Access and Services
Full data set available with a UTPro subscription
Road Access XXXXXX XXXXXX Mass Timber XXX
Municipal Water XXXXXX XXXXXX Green Standards XXXXXX
Municipal Sanitary Sewers XXXXXX XXXXXX LEED Certified XXXXXX
Municipal Storm Sewers XXXXXX XXXXXX Passive Home Certified XXX
Other (Septic) XXXXXX XXXXXX    
Minimum Setbacks
Full data set available with a UTPro subscription
Front Lot Line Direction X Side Lot Line 1 Direction X
Front Lot Line Existing XXXXXX Side Lot Line 1 Existing XXXXXX
Front Lot Line Proposed XXXXXX Side Lot Line 1 Proposed XXXXXX
       
Rear Lot Line Direction X Side Lot Line 2 Direction X
Rear Lot Line Existing XXXXXX Side Lot Line 2 Existing XXXXXX
Rear Lot Line Proposed XXXXXX Side Lot Line 2 Proposed XXXXXX
Applications
Full data set available with a UTPro subscription
Primary Approval XXX
Submission Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
DevApp URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Application Types XXXXXX XXXXXX XXXXXXXXXXXX
XXXXXX XXXXXX XXXXXXXXXXXX
OLT URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Approval Status XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Council Decision URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Approval Sub-Status XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Application #s XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Council Decision Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
OLT #s XXX: XXXXXX
XXX: XXXXXX
XXX: XXXXXX
Appeal Received Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
MZO #s XXX: XXXXXX
XXX: XXXXXX
XXX: XXXXXX
OLT Decision Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
   
MZO Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
   
Permits
Full data set available with a UTPro subscription
Links
Full data set available with a UTPro subscription
Website XXXXXXXXXXXXXXXXXX Registration XXXXXXXXXXXXXXXXXX
Email Social Media XXXXXXXXXXXXXXXXXX
Other XXXXXXXXXXXXXXXXXX    
Documents
Full data set available with a UTPro subscription
XXXXXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXX XXXXXXXXX-XX-XX
XXXXXXXXXX XXXXXXXXXXXXX-XX-XX
XXXXXXXXXXX XXXXXXXXXX-XX-XX
XXXXXX XXXXXXXXXXX-XX-XX
XXXXXXXX XXXXXXXXXXXXXX-XX-XX
XXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXXX XXXXXXXXXX-XX-XX
XXXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXXX XXXXXXXXXXXXXXX-XX-XX
Something is not right? Let us know!
Forum
Buildings Discussion
Views: 156K  |  Replies: 421  |  Last Post: Feb 09, 2023

Member Photos  
  25 photos

News