
Bay Adelaide Centre
16 renderings
Bay Adelaide Centre East, located on Adelaide Street West between Bay and Yonge Streets, adjacent to Bay Adelaide West, will be a 44-storey, 980,000-square-foot office tower with best-in-class operational, environmental and life-safety systems. Once completed, the East and West towers will represent the forefront of premier office product in Toronto’s financial core, encompassing the full Adelaide Street block between Bay and Yonge Streets.
Consistent with Bay Adelaide Centre West and all of Brookfield Office Properties’ new developments, Bay Adelaide Centre East will be built to a minimum LEED CS – Gold environmental certification.
The East tower’s expected completion date of late 2015/early 2016 coincides with several large office lease expiries in the financial core and gives these firms a new, premium build solution in a coveted location. The building will have direct access to subways and the amenities of the PATH underground pedestrian system.
The commencement of Bay Adelaide East is conditional on obtaining certain municipal approvals.
The 51-storey, 1.2-million-square-foot Bay Adelaide Centre West opened in 2009 and is 95% leased. At the time it was developed it was the first new office tower in Toronto’s financial core in 17 years. Completed on-time and under-budget in June 2009, Bay Adelaide Centre West was Toronto’s first LEED® Certified Core and Shell Gold high-rise office building.
Bay Adelaide Centre is anchored by prestigious legal and accounting firms and is considered ‘the centre of business’ in Toronto, representing a new standard for premier "AAA" class commercial properties. Integrating past and present, Brookfield was the first developer to successfully incorporate the historic National Building façade at 347 Bay Street into the stunning design of a premier 51-storey office property.
The sophisticated and contemporary ground floor lobby is vibrant and spacious, approximately 3 stories tall, with an abundance of natural light. The south wall of the lobby features a light installation designed by Arizona artist James Turrell, who has been recognized with prominent awards such as Guggenheim and MacArthur fellowships.
With concourse retail providing the final link to the underground PATH pedestrian walkway, the Centre features a ½-acre urban plaza and 1,100 stall parking garage with entrances on both Adelaide and Richmond Streets. Gingko trees and ornamental grasses frame the benches and open area in the adjacent Arnell Plaza, allowing a pleasant respite for visitors.
Life safety features, such as stairwells 20% wider than Ontario Building Code requirements, blast resistant glass for the bottom 11 stories and control collapse columns represent an understanding of design challenges in today’s security-conscious environment.
The 51-storey West Tower was designed by WZMH Architects with KPMG as its lead tenant. The 44-storey East Tower is designed by KPMB and Adamson Associates with Deloitte as its lead tenant.
In addition to Bay Adelaide Centre East and West, the third and final phase of the development – Bay Adelaide Centre North – can accommodate additional new development of approximately 500,000 square feet.
Find out how to promote this project on UrbanToronto
Expand/Collapse All
|
Export CSV
Full data set available with a UTPro subscription
|
|
Earliest Application Date
0000-00-00
|
Construction Status
Complete
|
|
Category
Commercial (Office, Retail)
|
Construction Began
0000-00-00
|
|
|
Completion Date
0000-00-00
|
|
Address
333 Bay St, Toronto, Ontario, M5H 2R2
|
Other Addresses
XXX XXXXXX XX, XXX XXXXXX XX
|
|
Latitude
XXXXXXXXX
|
Longitude
XXXXXXXXX
|
|
Region
XXXXXX
|
Ward
XX
|
|
MLS Zone
XX
|
|
Field Updates
XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX'.
XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX
XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX
|
Full data set available with a UTPro subscription
|
|
FAR/FSI
XXXXXX
|
Crane Number
XX
|
|
Site Area
XXXXXX XX
|
Heritage
XXX
|
|
Number of Buildings
2
|
|
|
Maximum Height
715 ft / 217.92 m
|
|
|
Maximum Storeys
51
|
|
|
Underground Levels
X
|
|
Full data set available with a UTPro subscription
|
|
Total Number Of Units
|
Total Rental Units
XXX
|
|
Building Units
|
Hotel Units
XXX
|
|
Market-Rate Rental Units
XXX
|
Freehold Units
XXX
|
|
Condo Units
XXX
|
Other Units
XXX
|
|
Unspecified Tenure Units
XXX
|
Affordable Rental Units
XXX
|
|
|
Rental Replacement Units
XXX
|
Full data set available with a UTPro subscription
|
|
Studios
XXX
|
|
|
1 Bedrooms
XXX
|
|
|
2 Bedrooms
XXX
|
|
|
3+ Bedrooms
XXX
|
|
Full data set available with a UTPro subscription
|
|
Total GFA
XXXXXX XX
|
Office GFA
XXXXXX XX
|
|
Commercial GFA
XXXXXX XX
|
Residential GFA
XXXXXX XX
|
|
Industrial GFA
XXXXXX XX
|
Retail GFA
XXXXXX XX
|
|
Institutional GFA
XXXXXX XX
|
|
Full data set available with a UTPro subscription
|
|
Total Vehicular Parking
XXX
|
Office Parking
XXX
|
|
Residential Parking
XXX
|
Industrial Parking
XXX
|
|
Visitor Parking
XXX
|
Institutional/Other Parking
XXX
|
|
Retail Parking
XXX
|
|
|
|
Bike Parking
XXX
|
Full data set available with a UTPro subscription
|
|
Road Access
XXXXXX XXXXXX
|
Mass Timber
XXX
|
|
Municipal Water
XXXXXX XXXXXX
|
Green Standards
XXXXXX
|
|
Municipal Sanitary Sewers
XXXXXX XXXXXX
|
LEED Certified
XXXXXX
|
|
Municipal Storm Sewers
XXXXXX XXXXXX
|
Passive Home Certified
XXX
|
|
Other (Septic)
XXXXXX XXXXXX
|
|
Full data set available with a UTPro subscription
|
|
Front Lot Line Direction
X
|
Side Lot Line 1 Direction
X
|
|
Front Lot Line Existing
XXXXXX
|
Side Lot Line 1 Existing
XXXXXX
|
|
Front Lot Line Proposed
XXXXXX
|
Side Lot Line 1 Proposed
XXXXXX
|
|
|
|
|
Rear Lot Line Direction
X
|
Side Lot Line 2 Direction
X
|
|
Rear Lot Line Existing
XXXXXX
|
Side Lot Line 2 Existing
XXXXXX
|
|
Rear Lot Line Proposed
XXXXXX
|
Side Lot Line 2 Proposed
XXXXXX
|
Full data set available with a UTPro subscription
|
|
Primary Approval
XXX
|
Submission Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
DevApp URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX
|
Application Types
XXXXXX XXXXXX XXXXXXXXXXXX XXXXXX XXXXXX XXXXXXXXXXXX
|
OLT URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX
|
Approval Status
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX
|
Council Decision URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX
|
Approval Sub-Status
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX
|
Application #s
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX
|
Council Decision Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
OLT #s
XXX: XXXXXX XXX: XXXXXX XXX: XXXXXX
|
Appeal Received Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
MZO #s
XXX: XXXXXX XXX: XXXXXX XXX: XXXXXX
|
OLT Decision Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
|
MZO Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
|
Full data set available with a UTPro subscription
|
Full data set available with a UTPro subscription
|
|
Website
XXXXXXXXXXXXXXXXXX
|
Registration
XXXXXXXXXXXXXXXXXX
|
|
Email
|
Social Media
XXXXXXXXXXXXXXXXXX
|
|
Other
XXXXXXXXXXXXXXXXXX
|
|
Full data set available with a UTPro subscription
|
XXXXXXXX XXXXXXXXXXXX-XX-XX |
XXXXXXXX XXXXXXXXX-XX-XX |
XXXXXXXXXX XXXXXXXXXXXXX-XX-XX |
XXXXXXXXXXX XXXXXXXXXX-XX-XX |
XXXXXX XXXXXXXXXXX-XX-XX |
XXXXXXXX XXXXXXXXXXXXXX-XX-XX |
XXXXX XXXXXXXXXXXX-XX-XX |
XXXXXXXXX XXXXXXXXXX-XX-XX |
XXXXXX XXXXXXXXXXXX-XX-XX |
XXXXXXXXX XXXXXXXXXXXXXXX-XX-XX |
|
|
|
|
Views: 771K | Replies: 2K | Last Post: Feb 10, 2023
|
 | 255 photos |