
Baif Don Head
12 renderings
Baif Don Head in Richmond Hill by Baif Developments and Hariri Pontarini Architects
A new mixed-use high-rise complex is, thus, proposed by Baif Development for its Don Head Lands. Located south of Major Mackenzie Drive along west of Yonge Street on the south side of Major Mackenzie Drive and west of the Civic Centre, this new addition will be Richmond Hill’s first High-Rise building of its kind. The architectural design, carefully conceived and developed by Hariri Pontarini Architects, maintains an urban edge along Yonge Street. To that end, the design incorporates a commercial strip of retail units along its edge, enforcing the pedestrian relationship to Yonge Street and creating a convenient life-style for the residence.
The proposed complex consists of four large residential blocks and a civic centre block at the south west corner of Yonge Street and Major Mackenzie. Each block is designed around a courtyard. The outer form of the block is broken down into a series of components; a ‘signature’ tower, townhomes, retail units relating to Yonge Street, and residential dwellings. The development along Yonge Street reflects the scale of the existing small retail stores which characteristically define the street, mitigating the large changes in topography along the site. Long, horizontal forms face Addison Street, while low scale townhomes line the flanking side streets. Each tower employs a uniquely coloured balcony guard and contains a large solar panel mast. Planted roofs and large green courtyards further identify these buildings as environmentally sensitive. As an exception, Parcel D, located at the north western edge of the site, does not contain a tower. Instead, sculpted terraces wrap around the courtyard and help transition the project away from Yonge Street into the low scale residential neighbourhood to the west. As a result, each element of the project responds to the site specific settings that surround the project. The design and development of the project is currently in progress, seeking Zoning Bylaw and Official Plan Amendment; therefore, the illustrated renderings and images are conceptual and subject to change.
Find out how to promote this project on UrbanToronto
Expand/Collapse All
|
Export CSV
Full data set available with a UTPro subscription
|
|
Earliest Application Date
0000-00-00
|
Construction Status
Pre-Construction
|
|
Category
Residential (Condo, Townhouse), Public Space / Park, Commercial (Retail)
|
Construction Began
0000-00-00
|
|
|
Completion Date
0000-00-00
|
|
Address
Yonge Street and Major Mackenzie Drive, Richmond Hill, Ontario
|
Other Addresses
XXX XXXXXX XX, XXX XXXXXX XX
|
|
Latitude
XXXXXXXXX
|
Longitude
XXXXXXXXX
|
|
Region
XXXXXX
|
Ward
XX
|
|
MLS Zone
XX
|
|
Field Updates
XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX'.
XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX
XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX
|
Full data set available with a UTPro subscription
|
|
FAR/FSI
XXXXXX
|
Crane Number
XX
|
|
Site Area
XXXXXX XX
|
Heritage
XXX
|
|
Number of Buildings
7
|
|
|
Maximum Height
0 ft / 0 m
|
|
|
Maximum Storeys
31
|
|
|
Underground Levels
X
|
|
Full data set available with a UTPro subscription
|
|
Total Number Of Units
|
Total Rental Units
XXX
|
|
Building Units
|
Hotel Units
XXX
|
|
Market-Rate Rental Units
XXX
|
Freehold Units
XXX
|
|
Condo Units
XXX
|
Other Units
XXX
|
|
Unspecified Tenure Units
XXX
|
Affordable Rental Units
XXX
|
|
|
Rental Replacement Units
XXX
|
Full data set available with a UTPro subscription
|
|
Studios
XXX
|
|
|
1 Bedrooms
XXX
|
|
|
2 Bedrooms
XXX
|
|
|
3+ Bedrooms
XXX
|
|
Full data set available with a UTPro subscription
|
|
Total GFA
XXXXXX XX
|
Office GFA
XXXXXX XX
|
|
Commercial GFA
XXXXXX XX
|
Residential GFA
XXXXXX XX
|
|
Industrial GFA
XXXXXX XX
|
Retail GFA
XXXXXX XX
|
|
Institutional GFA
XXXXXX XX
|
|
Full data set available with a UTPro subscription
|
|
Total Vehicular Parking
XXX
|
Office Parking
XXX
|
|
Residential Parking
XXX
|
Industrial Parking
XXX
|
|
Visitor Parking
XXX
|
Institutional/Other Parking
XXX
|
|
Retail Parking
XXX
|
|
|
|
Bike Parking
XXX
|
Full data set available with a UTPro subscription
|
|
Road Access
XXXXXX XXXXXX
|
Mass Timber
XXX
|
|
Municipal Water
XXXXXX XXXXXX
|
Green Standards
XXXXXX
|
|
Municipal Sanitary Sewers
XXXXXX XXXXXX
|
LEED Certified
XXXXXX
|
|
Municipal Storm Sewers
XXXXXX XXXXXX
|
Passive Home Certified
XXX
|
|
Other (Septic)
XXXXXX XXXXXX
|
|
Full data set available with a UTPro subscription
|
|
Front Lot Line Direction
X
|
Side Lot Line 1 Direction
X
|
|
Front Lot Line Existing
XXXXXX
|
Side Lot Line 1 Existing
XXXXXX
|
|
Front Lot Line Proposed
XXXXXX
|
Side Lot Line 1 Proposed
XXXXXX
|
|
|
|
|
Rear Lot Line Direction
X
|
Side Lot Line 2 Direction
X
|
|
Rear Lot Line Existing
XXXXXX
|
Side Lot Line 2 Existing
XXXXXX
|
|
Rear Lot Line Proposed
XXXXXX
|
Side Lot Line 2 Proposed
XXXXXX
|
Full data set available with a UTPro subscription
|
|
Primary Approval
XXX
|
Submission Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
DevApp URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX
|
Application Types
XXXXXX XXXXXX XXXXXXXXXXXX XXXXXX XXXXXX XXXXXXXXXXXX
|
OLT URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX
|
Approval Status
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX
|
Council Decision URLs
XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX XXX: XXXXXXXXXXXXXXXXXXXXXXXX
|
Approval Sub-Status
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX
|
Application #s
XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX XXX: XXXXXX XXXXXX
|
Council Decision Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
OLT #s
XXX: XXXXXX XXX: XXXXXX XXX: XXXXXX
|
Appeal Received Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
MZO #s
XXX: XXXXXX XXX: XXXXXX XXX: XXXXXX
|
OLT Decision Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
|
MZO Dates
XXX: XXXX-XX-XX XXX: XXXX-XX-XX XXX: XXXX-XX-XX
|
|
Full data set available with a UTPro subscription
|
Full data set available with a UTPro subscription
|
|
Website
XXXXXXXXXXXXXXXXXX
|
Registration
XXXXXXXXXXXXXXXXXX
|
|
Email
|
Social Media
XXXXXXXXXXXXXXXXXX
|
|
Other
XXXXXXXXXXXXXXXXXX
|
|
Full data set available with a UTPro subscription
|
XXXXXXXX XXXXXXXXXXXX-XX-XX |
XXXXXXXX XXXXXXXXX-XX-XX |
XXXXXXXXXX XXXXXXXXXXXXX-XX-XX |
XXXXXXXXXXX XXXXXXXXXX-XX-XX |
XXXXXX XXXXXXXXXXX-XX-XX |
XXXXXXXX XXXXXXXXXXXXXX-XX-XX |
XXXXX XXXXXXXXXXXX-XX-XX |
XXXXXXXXX XXXXXXXXXX-XX-XX |
XXXXXX XXXXXXXXXXXX-XX-XX |
XXXXXXXXX XXXXXXXXXXXXXXX-XX-XX |
|
|
|
|
Views: 16K | Replies: 28 | Last Post: Jan 18, 2021
|
|
|
|
Views: 2.9K | Replies: 1 | Last Post: Aug 29, 2013
|
 | 5 photos |