5.4K   7   5 
Baif Don Head
share  tweet  share 
  12 renderings
Baif Don Head in Richmond Hill by Baif Developments and Hariri Pontarini Architects

A new mixed-use high-rise complex is, thus, proposed by Baif Development for its Don Head Lands. Located south of Major Mackenzie Drive along west of Yonge Street on the south side of Major Mackenzie Drive and west of the Civic Centre, this new addition will be Richmond Hill’s first High-Rise building of its kind. The architectural design, carefully conceived and developed by Hariri Pontarini Architects, maintains an urban edge along Yonge Street. To that end, the design incorporates a commercial strip of retail units along its edge, enforcing the pedestrian relationship to Yonge Street and creating a convenient life-style for the residence.

The proposed complex consists of four large residential blocks and a civic centre block at the south west corner of Yonge Street and Major Mackenzie. Each block is designed around a courtyard. The outer form of the block is broken down into a series of components; a ‘signature’ tower, townhomes, retail units relating to Yonge Street, and residential dwellings. The development along Yonge Street reflects the scale of the existing small retail stores which characteristically define the street, mitigating the large changes in topography along the site. Long, horizontal forms face Addison Street, while low scale townhomes line the flanking side streets. Each tower employs a uniquely coloured balcony guard and contains a large solar panel mast. Planted roofs and large green courtyards further identify these buildings as environmentally sensitive. As an exception, Parcel D, located at the north western edge of the site, does not contain a tower. Instead, sculpted terraces wrap around the courtyard and help transition the project away from Yonge Street into the low scale residential neighbourhood to the west. As a result, each element of the project responds to the site specific settings that surround the project. The design and development of the project is currently in progress, seeking Zoning Bylaw and Official Plan Amendment; therefore, the illustrated renderings and images are conceptual and subject to change.

Find out how to promote this project on UrbanToronto
Expand/Collapse All   |   Export CSV
Project Information
Full data set available with a UTPro subscription
Earliest Application Date 0000-00-00 Construction Status Pre-Construction
Category Residential (Condo, Townhouse), Public Space / Park, Commercial (Retail) Construction Began 0000-00-00
    Completion Date 0000-00-00
Address Yonge Street and Major Mackenzie Drive, Richmond Hill, Ontario Other Addresses XXX XXXXXX XX, XXX XXXXXX XX
Latitude XXXXXXXXX Longitude XXXXXXXXX
Region XXXXXX Ward XX
MLS Zone XX    
Field Updates
XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX'.

XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX

XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX
Project Attributes
Full data set available with a UTPro subscription
FAR/FSI XXXXXX Crane Number XX
Site Area XXXXXX XX Heritage XXX
Number of Buildings 7    
Maximum Height 0 ft / 0 m    
Maximum Storeys 31    
Underground Levels X    
Project Companies
Developer Baif Developments
Builder Baif Developments
Architect Hariri Pontarini Architects
Landscape Architect Phillips Farevaag Smallenberg, PFS Studio
Units
Full data set available with a UTPro subscription
Total Number Of Units Total Rental Units XXX
Building Units Hotel Units XXX
Market-Rate Rental Units XXX Freehold Units XXX
Condo Units XXX Other Units XXX
Unspecified Tenure Units XXX Affordable Rental Units XXX
    Rental Replacement Units XXX
Unit Mix
Full data set available with a UTPro subscription
Studios XXX    
1 Bedrooms XXX    
2 Bedrooms XXX    
3+ Bedrooms XXX    
Gross Floor Area
Full data set available with a UTPro subscription
Total GFA XXXXXX XX Office GFA XXXXXX XX
Commercial GFA XXXXXX XX Residential GFA XXXXXX XX
Industrial GFA XXXXXX XX Retail GFA XXXXXX XX
Institutional GFA XXXXXX XX    
Parking
Full data set available with a UTPro subscription
Total Vehicular Parking XXX Office Parking XXX
Residential Parking XXX Industrial Parking XXX
Visitor Parking XXX Institutional/Other Parking XXX
Retail Parking XXX    
    Bike Parking XXX
Access and Services
Full data set available with a UTPro subscription
Road Access XXXXXX XXXXXX Mass Timber XXX
Municipal Water XXXXXX XXXXXX Green Standards XXXXXX
Municipal Sanitary Sewers XXXXXX XXXXXX LEED Certified XXXXXX
Municipal Storm Sewers XXXXXX XXXXXX Passive Home Certified XXX
Other (Septic) XXXXXX XXXXXX    
Minimum Setbacks
Full data set available with a UTPro subscription
Front Lot Line Direction X Side Lot Line 1 Direction X
Front Lot Line Existing XXXXXX Side Lot Line 1 Existing XXXXXX
Front Lot Line Proposed XXXXXX Side Lot Line 1 Proposed XXXXXX
       
Rear Lot Line Direction X Side Lot Line 2 Direction X
Rear Lot Line Existing XXXXXX Side Lot Line 2 Existing XXXXXX
Rear Lot Line Proposed XXXXXX Side Lot Line 2 Proposed XXXXXX
Applications
Full data set available with a UTPro subscription
Primary Approval XXX
Submission Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
DevApp URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Application Types XXXXXX XXXXXX XXXXXXXXXXXX
XXXXXX XXXXXX XXXXXXXXXXXX
OLT URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Approval Status XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Council Decision URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Approval Sub-Status XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Application #s XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Council Decision Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
OLT #s XXX: XXXXXX
XXX: XXXXXX
XXX: XXXXXX
Appeal Received Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
MZO #s XXX: XXXXXX
XXX: XXXXXX
XXX: XXXXXX
OLT Decision Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
   
MZO Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
   
Permits
Full data set available with a UTPro subscription
Links
Full data set available with a UTPro subscription
Website XXXXXXXXXXXXXXXXXX Registration XXXXXXXXXXXXXXXXXX
Email Social Media XXXXXXXXXXXXXXXXXX
Other XXXXXXXXXXXXXXXXXX    
Documents
Full data set available with a UTPro subscription
XXXXXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXX XXXXXXXXX-XX-XX
XXXXXXXXXX XXXXXXXXXXXXX-XX-XX
XXXXXXXXXXX XXXXXXXXXX-XX-XX
XXXXXX XXXXXXXXXXX-XX-XX
XXXXXXXX XXXXXXXXXXXXXX-XX-XX
XXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXXX XXXXXXXXXX-XX-XX
XXXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXXX XXXXXXXXXXXXXXX-XX-XX
Something is not right? Let us know!
Forum
Buildings Discussion
Views: 16K  |  Replies: 28  |  Last Post: Jan 18, 2021

Real Estate Discussion
Views: 2.9K  |  Replies: 1  |  Last Post: Aug 29, 2013

Member Photos  
  5 photos

News